Located in the renown South Texas Medical Center, the Start Center is the world’s largest Phase 1 clinical trial facility for cancer drugs. In just 14-months, METRO built San Antonio’s first 4-story concrete tilt-wall project with a connected 5-story parking garage over a 750,000 gallon drainage detention structure. The work included 120,000 square feet of state-of-the-art medical finish-out, 3” of limestone veneer applied to the 4-story radiused entry wall and an adjacent 1-acre memorial park. The project was awarded the South Texas Associated Builders and Contractors award for Best Healthcare Facility in the $10-$25 million category.